Exterior siding, flashing, building paper and window interfaces all play an important role in protecting a strata building from rain, moisture and air leakage.
At Northstrata Construction, we provide localized siding and flashing repairs, replacement and installation for strata properties, multi-family buildings, property managers and strata corporations. Our work can range from repairing localized deterioration and water-ingress areas to installing siding, flashing, building paper and window air-sealing components as part of new construction or exterior repair projects.
Our focus is practical: identify the problem, determine the required scope of work, and provide durable repairs using appropriate materials and installation methods.
We install and replace a range of exterior siding materials, depending on the building design and project requirements, including:
Where only a portion of the exterior is affected, localized siding replacement can often be coordinated with other repairs rather than replacing larger areas unnecessarily.
Proper flashing is an important part of controlling water at windows, doors, wall penetrations, deck-to-wall connections and other transitions.
Our flashing services include:
Building paper and other weather-resistive barrier systems provide an important layer of protection behind exterior cladding.
Northstrata provides installation and localized replacement of building paper and related weather-resistive barrier materials as part of siding and building-envelope work.
Our work can include:
The specific membrane or building-paper product should be selected based on the wall assembly, project specifications and applicable building-code requirements.
Modern BC construction places increased importance on controlling air leakage and moisture movement through the building envelope.
For new construction, the exterior wall assembly must be designed and constructed as a coordinated system. Siding alone does not provide the building’s complete air- or water-control layer.
Depending on the building design, the exterior wall assembly may incorporate:
For new construction in British Columbia, applicable air-leakage and energy-performance requirements depend on factors such as the building type, size, applicable BC Building Code requirements, energy-compliance pathway and project specifications.
Air-tightness is particularly important at transitions and penetrations, including:
A building can have high-quality siding and still experience air leakage if the air-barrier system and its transitions are not properly detailed and installed.
For projects where air-tightness testing is required, the installation of the air-barrier system and associated detailing should be coordinated with the building-envelope design and the requirements established by the project professionals.
Northstrata provides specialized installation of exterior window tapes and compatible air- and weather-sealing products as part of new construction and building-envelope repair work.
Our work can include:
The correct tape or membrane should be selected based on the specific window, substrate, building-paper or WRB system and manufacturer’s installation requirements. Compatibility between materials is important for long-term performance.
There is no single siding, tape, flashing or building-paper product that is appropriate for every strata building.
Material selection should consider:
For air-sealing and window detailing, we recommend using manufacturer-approved, compatible systems rather than mixing unrelated products.
For example, a window installation may require coordination between the window manufacturer’s flashing requirements, the project’s weather-resistive barrier, self-adhered flashing tape, sealants and exterior cladding.
Older strata buildings can develop localized deterioration around windows, decks, siding joints, flashing and other exterior transitions.
Our localized repair work may include:
Where concealed deterioration is suspected, the repair process may begin with a localized exploratory opening to determine the actual condition behind the exterior finishes.
For strata properties, exterior repairs often require coordination between the Strata Council, strata manager, property manager, owners and contractors.
Northstrata can assist with the initial site evaluation and provide documentation describing observed conditions and recommended repair work.
Where appropriate, our inspection documentation can include:
Where building-envelope engineering, design or professional review is required, we can coordinate our construction work with the appropriate qualified building-envelope professional.
The cost of siding, flashing and building-envelope repairs varies depending on:
Northstrata can first assess the visible conditions and help determine whether a localized repair, exploratory opening or larger investigation is appropriate.
At Northstrata Construction, we understand that strata repairs need to be approached carefully.
Our goal is to provide practical recommendations, clear communication and quality workmanship while coordinating the work with strata managers, property managers, councils and owners.
From localized siding and flashing repairs to window air-sealing, building-paper installation and exterior cladding work, we focus on the specific area requiring attention and the surrounding building-envelope details that affect its performance.